A pilot project raised in central Tanzania in 1997 has delivered the most promising prospects for future interventions. The design and aesthetic value of the plant has been welcomed, and the biogas system is therefore considered a prestige object desired by the decision makers in the domestic households in the area.

Since then the system has been tested in Cambodia and Thailand.

2001 CAMBODIA

Test carried out in collaboration with UTA University of Tropical Agriculture in Cambodia and Thomas Preston.

2002 CHEING MAI

A new version of the Supergas system, using hard watercontainers, was installed at The Land in Cheing Mai, Thailand.

2007 ZANZIBAR

Based on the installation in Cheing Mai to new Supergas systems were installed on Zanzibar in collaboration with the organizations “Dantan” and “ZALWEDA”